Subansiri Lower HE Project [2000 MW]
One of 2,330 projects Taiyo tracks in Arunachal Pradesh.
Source: India Investment Grid (IIG)
Information NHPC has come up with Subansiri Lower HE Project [2000 MW] with a ticket size of 21247.54 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project NHPC is implementing 2000 MW Subansiri Lower HE Project in Arunachal Pradesh and Assam on Subans
- Status
- Closed
- Sector
- Cement, Hydro, Tunnel, Wind, Power Generation (CCGT), Road, Government, Water Supply and Storage, Solar, Biomass
- Location
- Lower Subansiri, Arunachal Pradesh, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Subansiri Lower HE Project [2000 MW]
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information NHPC has come up with Subansiri Lower HE Project [2000 MW] with a ticket size of 21247.54 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project NHPC is implementing 2000 MW Subansiri Lower HE Project in Arunachal Pradesh and Assam on Subansiri River, a tributary of Brahmaputra. It has a Concrete Gravity Dam 116m high, 271m wide, 284m long, 8 Nos., 9.5m dia, horse shoe shaped, 7102 m total length Head Race Tunnel, Surface Power House, 285m x 61m x 64m with 8 Nos. Francis Turbine of 250 MW each, Annual Design Energy 7422 MU in a 90 percent deepenndable year. The project was transferred to NHPC for execution in May 2000 from Brahmaputra Board. CCEA approval for implementation was accorded on 09.9.2003 at sanctioned cost of Rs. 6285.33 Crores at Dec 02 PL with completion period of 7 years. Works were stalled since December 2011 due to agitation launched by various activists in Assam against the construction of Project raising issues of safety of Dam and its downstream impact. Further NGT, Kolkata vide order dated 11.12.2015 had also banned any work at the project except of emergency nature for maintenance for public safety purpose. Works at Project stalled since Dec11 and resumed w.e.f. 15.10.2019 after NGT clearance vide order dated 31.07.2019 and signing of MOA with Govt. of Assam on 23.08.2019. |
Original sector | Electricity Generation |
Procurement method | |
Budget |
Location
Country | India |
State | Arunachal Pradesh |
City | Lower Subansiri |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Cement, Hydro, Tunnel, Wind, Power Generation (CCGT), Road, Government, Water Supply and Storage, Solar, Biomass |
Article published date | 2024-02-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Luhri StageI Hydroelectric Project Himachal Pradesh India
- Lower Subansiri Hydroelectric Power Project
