Subansiri Lower Hydroelectric Project Unit #1
The owner, status and timeline of this project. A free account opens every field.
Source: Business Upturn
NHPC Limited has commenced commercial operations for Unit #1 of the Subansiri Lower Hydroelectric Project, which has a total capacity of 2000 MW. The unit, with a capacity of 250 MW, began operations at 00:00 hours on 20 March 2026. The project consists of eight units, each with a capacity of 250 MW, located on the border of Assam and Arunachal Pradesh.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Business Upturn
ConstructChat
Ask ConstructChat about Subansiri Lower Hydroelectric Project Unit 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NHPC Limited has commenced commercial operations for Unit #1 of the Subansiri Lower Hydroelectric Project, which has a total capacity of 2000 MW. The unit, with a capacity of 250 MW, began operations at 00:00 hours on 20 March 2026. The project consists of eight units, each with a capacity of 250 MW, located on the border of Assam and Arunachal Pradesh. |
Original sector | Energy |
Location
Country | India |
Source
Source | Business Upturn |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
