logo
ProjectUnder Construction

Subansiri Lower Hydroelectric Project

One of 2,330 projects Taiyo tracks in Arunachal Pradesh.

Source: thehawk.in

The Subansiri Lower Hydroelectric Project in Arunachal Pradesh is expected to generate 2,000 MW of power by December 2026, making it the largest hydroelectric project in India. Initiated in 2001, the project has faced setbacks due to protests but has regained momentum with significant machinery already operational. It features the country's longest reservoir stretch of nearly 45 km and is a key ex

Status
Under Construction
Sector
Hydro, Water Supply and Storage, Power Generation (CCGT)
Location
Dollungmukh, Arunachal Pradesh, India
Updated
22 Jul 2026
Source
thehawk.in

ConstructChat

Ask ConstructChat about Subansiri Lower Hydroelectric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Subansiri Lower Hydroelectric Project” is an infrastructure initiative in the Hydro sector, located in Dollungmukh, Arunachal Pradesh, India. Taiyo aggregates data on it from thehawk.in.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Subansiri Lower Hydroelectric Project in Arunachal Pradesh is expected to generate 2,000 MW of power by December 2026, making it the largest hydroelectric project in India. Initiated in 2001, the project has faced setbacks due to protests but has regained momentum with significant machinery already operational. It features the country's longest reservoir stretch of nearly 45 km and is a key example of the 'Viksit Bharat' vision. The project aims to enhance India's power generation capacity substantially.

Original sector

Energy

Location

Country

India

State

Arunachal Pradesh

City

Dollungmukh

Source

Source

thehawk.in

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Power Generation (CCGT)

Article published date

2026-03-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project