logo
ProjectUnder Construction

Subansiri Lower Hydroelectric Project

One of 4,294 projects Taiyo tracks in Assam.

Source: The Assam Tribune

The Subansiri Lower Hydroelectric Project is a 2,000 MW run-of-river hydroelectric project with water storage on the Subansiri River. It is the largest hydroelectric project ever undertaken in India, being constructed by NHPC under the Ministry of Power.

Status
Under Construction
Sector
Power Generation (CCGT), Water Supply and Storage, Government
Location
Guwahati, Assam, India
Updated
22 Jul 2026
Source
The Assam Tribune

ConstructChat

Ask ConstructChat about Subansiri Lower Hydroelectric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Subansiri Lower Hydroelectric Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Guwahati, Assam, India. Taiyo aggregates data on it from The Assam Tribune.

Participants

Sponsoring Agency

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Subansiri Lower Hydroelectric Project is a 2,000 MW run-of-river hydroelectric project with water storage on the Subansiri River. It is the largest hydroelectric project ever undertaken in India, being constructed by NHPC under the Ministry of Power.

Original sector

Energy

Location

Country

India

State

Assam

City

Guwahati

Source

Source

The Assam Tribune

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Government

Article published date

2025-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project