Subbasement Pipe Replacement
Closed · Wisconsin · Last reported Apr 2024
Source: Dodge USA
Replace 220 feet of deteriorated cast iron sewer pipe with PVC in the sub-basement of Building 111 to include elbows, cleanouts, and fittings at the Zablocki VA medical center in Milwaukee, Wi.
- Status
- Closed
- Sector
- Commercial, Metal, Water Supply and Storage, Hospital, Waste Processing and Treatment, Steel, Hotel
- Location
- Milwaukee, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Subbasement Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace 220 feet of deteriorated cast iron sewer pipe with PVC in the sub-basement of Building 111 to include elbows, cleanouts, and fittings at the Zablocki VA medical center in Milwaukee, Wi. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Milwaukee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Water Supply and Storage, Hospital, Waste Processing and Treatment, Steel, Hotel |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
