logo
ProjectBid Results

Substation Feeder Exits

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Dodge USA

This project involves replacing 4 Underground ageing feeders out of Fort Valley s #1 12 KV Substation. Project is located at 580 Hampton St. Fort Valley Georgia 31030. Consists of setting four Ductile Iron poles: 45/H9 approx. 3973lbs each. Install two, 55/1 wood poles. Install four Duel 6 schedule 40 duct banks with a combined length of approx. 650ft. Install approx. 990ft. combined length of 100

Status
Closed
Sector
Power Transmission, Metal, Government, Telecommunications, Steel, Power Generation (CCGT), Commercial
Location
Fort Valley, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Substation Feeder Exits

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Substation Feeder Exits” is an infrastructure initiative in the Power Transmission sector, located in Fort Valley, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves replacing 4 Underground ageing feeders out of Fort Valley s #1 12 KV Substation. Project is located at 580 Hampton St. Fort Valley Georgia 31030. Consists of setting four Ductile Iron poles: 45/H9 approx. 3973lbs each. Install two, 55/1 wood poles. Install four Duel 6 schedule 40 duct banks with a combined length of approx. 650ft. Install approx. 990ft. combined length of 1000mcm 3 phase primary cable. Install 24 1000mcm terminators. Install 6 Gang operated RLB switches....

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Fort Valley

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Metal, Government, Telecommunications, Steel, Power Generation (CCGT), Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project