Substation Feeder Exits
Sector: Telecommunications • Location: Fort Valley, Georgia, United States of America
Source: Dodge USA
This project involves replacing 4 Underground ageing feeders out of Fort Valley s #1 12 KV Substation. Project is located at 580 Hampton St. Fort Valley Georgia 31030. Consists of setting four Ductile Iron poles: 45/H9 approx. 3973lbs each. Install two, 55/1 wood poles. Install four Duel 6 schedule 40 duct banks with a combined length of approx. 650ft. Install approx. 990ft. combined length of 100
- Status
- Closed
- Sector
- Telecommunications, Metal, Power Transmission, Power Generation (CCGT), Government, Steel, Commercial
- Location
- Fort Valley, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Substation Feeder Exits
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves replacing 4 Underground ageing feeders out of Fort Valley s #1 12 KV Substation. Project is located at 580 Hampton St. Fort Valley Georgia 31030. Consists of setting four Ductile Iron poles: 45/H9 approx. 3973lbs each. Install two, 55/1 wood poles. Install four Duel 6 schedule 40 duct banks with a combined length of approx. 650ft. Install approx. 990ft. combined length of 1000mcm 3 phase primary cable. Install 24 1000mcm terminators. Install 6 Gang operated RLB switches.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Fort Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Metal, Power Transmission, Power Generation (CCGT), Government, Steel, Commercial |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE