Substation Site Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project includes the following Work: Approximately 2,400 CY excavation, 6,500 SY topsoil placement and grading including seeding and erosion control mat and the placement of densely graded base for the substation site. The project also includes the installation of storm sewer improvements and construction of a pond consisting of approximately 140 LF of RCP storm sewer, 1 manhole, and 5 endwall
- Status
- Closed
- Sector
- Waste Processing and Treatment, Commercial, Water Supply and Storage, Government, Manufacturing (Industrial)
- Location
- Oconto Falls, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Substation Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Approximately 2,400 CY excavation, 6,500 SY topsoil placement and grading including seeding and erosion control mat and the placement of densely graded base for the substation site. The project also includes the installation of storm sewer improvements and construction of a pond consisting of approximately 140 LF of RCP storm sewer, 1 manhole, and 5 endwalls, 900 CY clay pond liner and an outlet structure. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Oconto Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Water Supply and Storage, Government, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
