Subsurface Utility Engineering Services
One of 10,000+ projects Taiyo tracks in Minnesota.
Source: Dodge
MnDOT requests proposals for A Subsurface Utility Engineering contract will provide the utilities designation for Trunk Highway (TH) 65 located in the right of way from 65 from 37th Avenue to river in the Minneapolis all in Hennepin County. Utilities will be drawn in 3d model as specified by MnDOT Computer Aided Design and Drafting (CADD) standards. The goal is to have the field work done in fall
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Power Generation (CCGT), Commercial
- Location
- Minneapolis, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Subsurface Utility Engineering Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | MnDOT requests proposals for A Subsurface Utility Engineering contract will provide the utilities designation for Trunk Highway (TH) 65 located in the right of way from 65 from 37th Avenue to river in the Minneapolis all in Hennepin County. Utilities will be drawn in 3d model as specified by MnDOT Computer Aided Design and Drafting (CADD) standards. The goal is to have the field work done in fall 2024 and support through the final design work finishing in 2027. Project Goal The goal of this p... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minneapolis |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Power Generation (CCGT), Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
