logo

Subway Track Rehabilitation Program

Sector: Power Generation (CCGT) • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This program is aimed to rehabilitate the running Subway Track, which includes the following activities: • Replacement of curved and tangent rail sections approximating the maximum allowable half inch head or gauge face wear, corrugated and worn tangent rail and damaged track components • Re-insulation of the negative and signal rails by replacing existing deteriorated rail fasteners with new insu

Status
Closed
Sector
Power Generation (CCGT), Mass Transit, Rail, Tunnel
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Subway Track Rehabilitation Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Subway Track Rehabilitation Program” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This program is aimed to rehabilitate the running Subway Track, which includes the following activities: • Replacement of curved and tangent rail sections approximating the maximum allowable half inch head or gauge face wear, corrugated and worn tangent rail and damaged track components • Re-insulation of the negative and signal rails by replacing existing deteriorated rail fasteners with new insulated fastening assemblies and shims • Replacement of ties in order to maintain an adequate level of safety and sustain the overall condition of the track • Replace complete power rail sections in the Subway due to excessive wear and arching as required • Replace existing old style insulated joints with a more reliable and safer joint based on priority • Repair the sub-grade and drainage where ballast pumping re-occurs in spite of regular preventative maintenance

Original sector

Public Transit

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Mass Transit, Rail, Tunnel

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project