Sudan - Solar PV Powered Pumping for Irrigation Project (Desert-to-Power Initiative)
Sector: Raw Materials • Location: Sudan
Source: African Development Bank (AfDB)
The Solar Photovoltaic (PV) Powered Pumping Systems Project is a potential breakthrough for the agriculture sector in Sudan. It is being a groundwork for the Government’s Solar PV policy, the renewable energy development and the Intended Nationally Determined Contribution (INDC) and acts as a catalyst for the operationalization of the Solar PV Fund. Provision of solar powered water pumps to the fa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Solar Photovoltaic (PV) Powered Pumping Systems Project is a potential breakthrough for the agriculture sector in Sudan. It is being a groundwork for the Government’s Solar PV policy, the renewable energy development and the Intended Nationally Determined Contribution (INDC) and acts as a catalyst for the operationalization of the Solar PV Fund. Provision of solar powered water pumps to the farmers, incorporates efficiency-based model that reduces dependence on fossil fuel, improves crops production at lesser costs, and improves farmers’ livelihoods. This project addresses the need for efficient and adequate energy provision for irrigation in Sudan by facilitating the replacement of diesel-powered pumping systems with innovative technologies relying fully on solar PV power. It covers two states, North Kordofan and West Kordofan. The project will play a critical role in creating a market that has not presently matured in Sudan and supporting it through the nascent stage to a point where it is self-sustaining and able to respond to the needs of the farmers. It targets to: (i) install 1,170 solar PV pumps, (ii) establish workshops, one in North Kordofan and another in West Kordofan, for maintaining, servicing and repairing solar powered pumps; and (iii) supply additional testing equipment for the solar PV pumps testing laboratory to ensure quality standards, quality assurance, testing and certification, and for training and capacity building. Construction is expected to be implemented over a period of 24 months after EPC contract effectiveness and scheduled to be completed by September 2023. The project’s cost is estimated at UA 15.867 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
