logo

Sudbury-Hudson Transmission Reliability Project and Mass Central Rail Trail Section

Sector: Rail • Location: Sudbury, Massachusetts, United States

Source: Milford Daily News

Project
Completed

The project involved the installation of a 9-mile underground transmission line between Eversource’s Sudbury substation and the Hudson Light and Power substation, strengthening electric system reliability for Greater Boston. About 7.6 miles of the line were placed along an inactive Massachusetts Bay Transportation Authority railroad corridor, creating a base for the new 7.5-mile section of the Mas

Project Information FAQ

Project Information

3 Q
The project “Sudbury-Hudson Transmission Reliability Project and Mass Central Rail Trail Section” is an infrastructure initiative in the Rail sector, located in Sudbury, Massachusetts, United States. Taiyo aggregates data on it from Milford Daily News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involved the installation of a 9-mile underground transmission line between Eversource’s Sudbury substation and the Hudson Light and Power substation, strengthening electric system reliability for Greater Boston. About 7.6 miles of the line were placed along an inactive Massachusetts Bay Transportation Authority railroad corridor, creating a base for the new 7.5-mile section of the Mass Central Rail Trail. The trail section adds walking, running, and biking opportunities and includes amenities such as road crossings, benches, signage, landscaping, and the restored Diamond Junction. The trail segment runs through the Wayside corridor from Hudson through Stow to Sudbury and is part of a broader trail planned to connect 26 communities across 104 miles from Boston to Northampton.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data