Sudbury to Barrie 500-kilovolt Transmission Line
The owner, status and timeline of this project. A free account opens every field.
Source: ParrySound.com
Hydro One is developing a 500-kilovolt transmission line from the Hanmer Transformer Station in Sudbury to the Essa Transfer Station near Barrie. The project aims to strengthen the north-south transmission and add capacity alongside the existing transmission line. The preferred route will be announced in 2027, construction is planned to start in 2029, and the line is expected to be energized by 20
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Road
- Location
- Parry Sound, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- ParrySound.com
ConstructChat
Ask ConstructChat about Sudbury to Barrie 500-kilovolt Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hydro One is developing a 500-kilovolt transmission line from the Hanmer Transformer Station in Sudbury to the Essa Transfer Station near Barrie. The project aims to strengthen the north-south transmission and add capacity alongside the existing transmission line. The preferred route will be announced in 2027, construction is planned to start in 2029, and the line is expected to be energized by 2032. |
Original sector | Energy |
Location
Country | Canada |
State | Ontario |
City | Parry Sound |
Source
Source | ParrySound.com |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Road |
Article published date | 2026-04-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
