logo

SUGAR HILL GREENWAY FROM SR 20 TO STANLEY STREET - LCI

Sector: Manufacturing (Industrial) • Location: Sugar Hill, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project is a shared-use path that begins at the intersection of SR-20 and Peachtree Industrial Boulevard and travels South to the intersection of Peachtree Industrial Boulevard and Alton Tucker Boulevard, veering West down Alton Tucker Boulevard and West Broad Street, and cutting back towards SR-20 at the planned pedestrian bridge that connects to Stanley Street. The project will create inter

Project Information FAQ

Project Information

4 Q
The project “SUGAR HILL GREENWAY FROM SR 20 TO STANLEY STREET - LCI” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Sugar Hill, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is a shared-use path that begins at the intersection of SR-20 and Peachtree Industrial Boulevard and travels South to the intersection of Peachtree Industrial Boulevard and Alton Tucker Boulevard, veering West down Alton Tucker Boulevard and West Broad Street, and cutting back towards SR-20 at the planned pedestrian bridge that connects to Stanley Street. The project will create intersection safety improvements, realignment of an intersection, a cycle track, and high visibility crosswalks. The pedestrian and bike path will tie in with the Sugar Hill Greenway and connect to Gwinnett’s County-Wide trail system. The project will include the introduction of slip lanes, raised and high-visibility crosswalks, ADA accessible ramps, a refuge island, a graded pedestrian bridge crossing, truck aprons, a four-way stop, two three-way stops, and dedicated signal phases for pedestrians.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data