Sugar Hill Retail Development - Sugar Hill, GA
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge USA
This is the construction of two ground-up multi-tenant shell retail buildings in Sugar Hill, GA. Building 100 is approximately 6,035 sq ft. Building 200 is approximately 7,240 sq ft. The project includes, but is not limited to all site work, and the building is a combination of structural steel, wood framing, standing seam metal roof, finishes, storefront, MEPs.
- Status
- Closed
- Sector
- Metal, Steel, Manufacturing (Industrial), Commercial
- Location
- Buford, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sugar Hill Retail Development - Sugar Hill, GA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is the construction of two ground-up multi-tenant shell retail buildings in Sugar Hill, GA. Building 100 is approximately 6,035 sq ft. Building 200 is approximately 7,240 sq ft. The project includes, but is not limited to all site work, and the building is a combination of structural steel, wood framing, standing seam metal roof, finishes, storefront, MEPs. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Buford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Manufacturing (Industrial), Commercial |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
