logo

Sugar Land Ryehill Groundwater Plant - Phase I REBID

Sector: Water Supply and Storage • Location: Sugar Land, Texas, United States of America

Source: Dodge

Project
Closed

In accordance with the contract documents: One (1) 2,500 gpm rated vertical turbine well pump, potable groundwater well including header piping and controls, two (2) 60 diameter, 500,000 gallon ground storage tanks (GST), one (1) 15,000 gallon hydropneumatic tank, three (3) 2500 gpm rated booster pumps, one (1) CMU building to house booster pumps with isolation for chlorine injection pumps, storag

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Wind, Government
Location
Sugar Land, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Sugar Land Ryehill Groundwater Plant - Phase I REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sugar Land Ryehill Groundwater Plant - Phase I REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Sugar Land, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In accordance with the contract documents: One (1) 2,500 gpm rated vertical turbine well pump, potable groundwater well including header piping and controls, two (2) 60 diameter, 500,000 gallon ground storage tanks (GST), one (1) 15,000 gallon hydropneumatic tank, three (3) 2500 gpm rated booster pumps, one (1) CMU building to house booster pumps with isolation for chlorine injection pumps, storage tank, controls, chlorine storage, MCC and electrical equipment, an 8' tall security fence and e...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Sugar Land

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Wind, Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project