logo
ProjectComplete

Sugd Energy Loss Reduction project

One of 2,118 projects Taiyo tracks in Tajikistan.

Source: European Bank for Reconstruction and Development (EBRD)

In June 2011, the Bank approved USD 10.15 million sovereign guaranteed loan to Barki Tojik for the supply and installation of new electricity meters, meter reading system and automated billing system, in the Sugd region of Tajikistan to reduce the existing level of electricity losses in the network, increase bill collection levels and improve quality of electricity supply. In 2016 during the imple

Status
Closed
Sector
Power Generation (CCGT), Power Transmission, Government, Commercial, Residential
Location
Tajikistan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Sugd Energy Loss Reduction project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sugd Energy Loss Reduction project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Tajikistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In June 2011, the Bank approved USD 10.15 million sovereign guaranteed loan to Barki Tojik for the supply and installation of new electricity meters, meter reading system and automated billing system, in the Sugd region of Tajikistan to reduce the existing level of electricity losses in the network, increase bill collection levels and improve quality of electricity supply. In 2016 during the implementation of the Project interim results were encouraging and Barki Tojik requested the Bank, and the Bank approved in 2016, an increase of the original loan by USD 4.0 million. The extension further reduced the electricity distribution losses by partial rehabilitation of related electricity distribution network equipment to reduce network losses and to improve quality of supply. Together these measures supported the transition of Barki Tojik to a profitable commercial entity.

Original sector

Energy

Budget

Location

Country

Tajikistan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Government, Commercial, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project