Sugd Transmission Grid Upgrade
Sector: Government • Location: Tajikistan
Source: European Bank for Reconstruction and Development (EBRD)
The provision of financing for rehabilitation of the existing transformer of 3*167MVA at 500/220/35 kV substation in the Sugd region of Tajikistan (the "Project") in the form of up to EUR 10.2 million sovereign loan to the Republic of Tajikistan with loan proceeds to be on-lent to OJSC Shabaqahoi Intiqoli Barq, the implementing entity. The loan will be co-financed by investment grants from the EBR
- Status
- Under Construction
- Sector
- Government, Power Generation (CCGT), Residential, Power Transmission, Commercial
- Location
- Tajikistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Sugd Transmission Grid Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The provision of financing for rehabilitation of the existing transformer of 3*167MVA at 500/220/35 kV substation in the Sugd region of Tajikistan (the "Project") in the form of up to EUR 10.2 million sovereign loan to the Republic of Tajikistan with loan proceeds to be on-lent to OJSC Shabaqahoi Intiqoli Barq, the implementing entity. The loan will be co-financed by investment grants from the EBRD Shareholder Special Fund (the "SSF") in the amount of up to EUR 3.5 million and the Sustainable Infrastructure Fund ("SIF"), administered by the Bank, in the amount of up to EUR 1 million. |
Original sector | Energy |
Budget |
Location
Country | Tajikistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT), Residential, Power Transmission, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
