Suisun City Fire Dept. Remodel - Phase 1
Sector: Car parking • Location: Suisun City, California, United States of America
Source: Dodge USA
Phase 1 consists of Remodeling the existing fire station separation wall between the apparatus bay (garage) and business/dorm area into a 2-hour rated wall separation. The proposed upgraded 2-hour rated fire wall separation is to extend to upper roof deck. Kitchen door, storage, lobby door and attic doors are to be relocated and upgraded to corresponding rated openings. The relocated openings are
- Status
- Under Construction
- Sector
- Car parking, Government, Manufacturing (Industrial), Automotive, Commercial
- Location
- Suisun City, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Suisun City Fire Dept. Remodel - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1 consists of Remodeling the existing fire station separation wall between the apparatus bay (garage) and business/dorm area into a 2-hour rated wall separation. The proposed upgraded 2-hour rated fire wall separation is to extend to upper roof deck. Kitchen door, storage, lobby door and attic doors are to be relocated and upgraded to corresponding rated openings. The relocated openings are in coordination with phase II future remodel plans. Phase I remodel also includes the replacement... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Suisun City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Government, Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
