Sukhna Choe Four-Lane Bridge
Sector: Bridge • Location: Chandigarh, India
Source: Hindustan Times
A high-level four-lane all-weather bridge over the Sukhna Choe connecting Manimajra and Sector 26 in Chandigarh. The bridge is 500 metres long and 26.6 metres wide, designed to replace the existing low-level causeway which faces frequent congestion and submersion during monsoons. It includes dual carriageways, pedestrian and cycling infrastructure, and is built using reinforced cement concrete and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A high-level four-lane all-weather bridge over the Sukhna Choe connecting Manimajra and Sector 26 in Chandigarh. The bridge is 500 metres long and 26.6 metres wide, designed to replace the existing low-level causeway which faces frequent congestion and submersion during monsoons. It includes dual carriageways, pedestrian and cycling infrastructure, and is built using reinforced cement concrete and precast technology. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
