logo

Sukhodol hot press stamping plant

Sector: Oil and Gas • Location: Russia

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

Translated version of this PSD: Russian EBRD is considering providing a corporate loan to Oil and Gas Systems (the “Company”) to finance the construction of a greenfield hot press stamping plant near the town of Sukhodol, Tula region, to secure own supply of half-body casings for the production of pipeline valves and to enter the growing market of large stamped parts used in various industries in

Project Information FAQ

Project Information

3 Q
The project “Sukhodol hot press stamping plant” is an infrastructure initiative in the Oil and Gas sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Russian EBRD is considering providing a corporate loan to Oil and Gas Systems (the “Company”) to finance the construction of a greenfield hot press stamping plant near the town of Sukhodol, Tula region, to secure own supply of half-body casings for the production of pipeline valves and to enter the growing market of large stamped parts used in various industries in Russia (the “Project)”. The proposed facility should assist Oil and Gas Systems in securing the financing with a tenor appropriate for a large-size greenfield investment. The Project will: i) allow to keep the production of pipeline valves, critical security and control elements for the national pipeline infrastructure while improving their quality and environmental safety; ii) improve vertical integration within the Company, significantly increase energy efficiency and reduce metal consumption as compared to outdated stamping process currently outsourced to the third parties; iii) demonstrate new processes and innovative approaches for the stamping industry. In addition, the proposed financing will facilitate enterprise restructuring and setting standards of business conduct including IFRS reporting and environmental and social standards. Oil and Gas Systems, which owns and operates Tyazhpromarmatura plant, a leading Russian producer of pipeline valves, and Sukhodol Press Forging, a greenfield hot press stamping plant. The EBRD will provide €90 million senior loan with up to €25 million to be syndicated to commercial banks. DEG is expected to provide up to €15 million as a parallel loan. The total financing will comprise approx €105 million The project is Categorised B. The construction and operation of new state-of-the-art hot press stamping facility is associated with a limited number of potential environmental and social impacts, which are site-specific and readily identified and mitigated. An Independent Consultant was retained to conduct Environmental and Social Due Diligence (ESDD) of the Project and the Company to assess the current environmental standing as well as ascertain the capacity of the firm to implement the Bank’s Performance Requirements (PRs). The ESDD confirmed that the Company has the capacity to implement the Banks PRs and the site is not located in a sensitive location. The new facility will be designed to meet best international standards, and will include state-of-the-art environmental abatement equipment. Based on the ESDD an Environmental and Social Action Plan (ESAP) has been developed and is being agreed with the client, which will include commitments to meet best international standards and the Company will develop and implement an Environmental Health and Safety management systems, namely ISO 14001 and OHSAS 18001. The Project will be subject to a formal environmental permitting process as part of project design, and a local EIA (OVOS) will be developed for the project. This will include additional local consultations of the project. The Bank will monitor the environmental permitting process for the plant. None. Mrs. Irina Yumangulova, CFO, Oil and Gas Systems E-mail: yumangulova@ogscomp.ru Tel: +7 (495) 411 77 57

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data