Sulaymaniya Gas Power Station SGPS
Sector: Commercial • Location: Iraq
Source: World Bank Group
Mass Group Holding (MGH), from Jordan, was awarded the Build-Own-Operate contract of the 750MW Sulaymaniya natural gas-fired power plant SGPS. The project was located near Sulaymaniya, Kurdistan. The project can run on light diesel as backup fuel.
Turbines were purchased from General Electric (Frame-9E Type), with the eye on future conversion to combined cycle and capacity expansion. Thee 132kV
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Mass Group Holding (MGH), from Jordan, was awarded the Build-Own-Operate contract of the 750MW Sulaymaniya natural gas-fired power plant SGPS. The project was located near Sulaymaniya, Kurdistan. The project can run on light diesel as backup fuel. Turbines were purchased from General Electric (Frame-9E Type), with the eye on future conversion to combined cycle and capacity expansion. Thee 132kV switchyard was supplied by ABB from Sweden. The project was expanded from 500MW to 750MW in 2010 (commissioned in April 2011). In April 2013, MGH sold 50% of equity to Abu Dhabi National Energy (TAQA). The project is expected to be expanded with another 250MW to 1,000MW. The EPC contractor of the expansion was ABB from Switzerland with turbines supplied by GE. The project holds a 15 year power purchase agreement with the KRG Electricity Ministry. Natural gas was supplied via pipeline from the Khor Mor natural gas field, operated by Pearl Petroleum, owned by Dana Gas (40%), Crescent Petroleum (40%), OMV (10%) and MOL Hungarian Oil and Gas Company (10%). Until 2012 the project was operated by Wood Group (UK), but the contract was canceled in January 2012 in favor of Enka from Turkey. The project was financed via corporate finance on MGH balance sheet. Very limited information available. http://www.massgroupholding.com/MassPages.aspx?PID=15&lang=en Estimate of 1 mill per MW capacity added |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
