Sullivan Pier Ramp & Float Replacement
Planning schematics · Washington · Last reported Nov 2024
Source: Dodge USA
Remove existing dock and replace with new. New dock consists of a 4'x29' pier supported by 8 piles 6" in diameter, a 3'x6' aluminum ramp, and a 8' x 20' float attached to 4 piles 6" in diameter. Float includes float cradle. This permit in in place of the original after-the-fact permit to repair the floats which had received authorization via an HPA.
- Status
- Prospective
- Sector
- Steel, Metal, Manufacturing (Industrial), Commercial
- Location
- Hoodsport, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sullivan Pier Ramp & Float Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove existing dock and replace with new. New dock consists of a 4'x29' pier supported by 8 piles 6" in diameter, a 3'x6' aluminum ramp, and a 8' x 20' float attached to 4 piles 6" in diameter. Float includes float cradle. This permit in in place of the original after-the-fact permit to repair the floats which had received authorization via an HPA. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Hoodsport |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Manufacturing (Industrial), Commercial |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
