Summer Meadows First Addition
Closed · Minnesota · Last reported Mar 2024
Source: Dodge USA
3,779 LF Sanitary Sewer and Appurtenances, 4 -8 diameter 3,647 LF PVC Watermain and Appurtenances, 1 -8 diameter 1,598 LF RC Storm Sewer Pipe and Appurtenances, 12 -15 diameter 74,800 CY Common Excavation 1,568 CY Aggregate Base 3,772 LF Concrete Curb and Gutter 15,035 SF Concrete Sidewalk 1.060 TN Bituminous Surfacing 16 AC Restoration
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Car parking, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Alexandria, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Summer Meadows First Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 3,779 LF Sanitary Sewer and Appurtenances, 4 -8 diameter 3,647 LF PVC Watermain and Appurtenances, 1 -8 diameter 1,598 LF RC Storm Sewer Pipe and Appurtenances, 12 -15 diameter 74,800 CY Common Excavation 1,568 CY Aggregate Base 3,772 LF Concrete Curb and Gutter 15,035 SF Concrete Sidewalk 1.060 TN Bituminous Surfacing 16 AC Restoration |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Alexandria |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Car parking, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
