logo
ProjectStart

Summerlea Road Watermain Replacement

Start · Ontario · Last reported Mar 2025

Source: Dodge

Subsurface Utility Engineering (SUE) Investigation for the Proposed 300MM Watermain Replacement along Baker Road and Colony Court from Summerlea Road to Cul-De-Sac, City of Brampton, Project 25-1340

Status
Prospective
Sector
Water Supply and Storage, Government, Commercial, Power Transmission, Road, Power Generation (CCGT)
Location
Brampton, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Summerlea Road Watermain Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Summerlea Road Watermain Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Brampton, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Subsurface Utility Engineering (SUE) Investigation for the Proposed 300MM Watermain Replacement along Baker Road and Colony Court from Summerlea Road to Cul-De-Sac, City of Brampton, Project 25-1340

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Brampton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Power Transmission, Road, Power Generation (CCGT)

Article published date

2025-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project