logo

Summerside Solar and Storage Integration Project

Sector: Solar • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
In Progress

The Project consists of the construction of a 21 megawatt (MW) solar farm that includes 2400 strings of 28 arrays of solar, (67,200 photovoltaic modules), along with a 10MW/20MW battery storage facility, in its recently built wellfield of 80 acres. The site layout accommodates solar modules, inverters as well as the energy storage system. The Project aims to use a "greener" form of energy to impr

Status
Under Construction
Sector
Solar, Manufacturing (Industrial), Energy Storage, Raw Materials, Automotive, Power Generation (CCGT), Electric Vehicles (EVs), Commercial, Government
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Summerside Solar and Storage Integration Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Summerside Solar and Storage Integration Project” is an infrastructure initiative in the Solar sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the construction of a 21 megawatt (MW) solar farm that includes 2400 strings of 28 arrays of solar, (67,200 photovoltaic modules), along with a 10MW/20MW battery storage facility, in its recently built wellfield of 80 acres. The site layout accommodates solar modules, inverters as well as the energy storage system. The Project aims to use a "greener" form of energy to improve the energy efficiency of the City and reduce electricity costs for its residents. The benefits of this project include the integration into the electrical grid of 30,000 MWh of solar energy, which equates to the removal of 21,000 tonnes of CO2 per year, and a greener community using almost 62% renewable energy for electricity needs. The project will improve power quality, energy flow, and reliability of all sources of generation, and reduce peak demand thereby flowing efficiencies and savings while maximizing capital assets. The project will facilitate the integration of renewable technologies like solar panels and electric vehicles, and help to keep voltage levels constant for commercial and industrial customers.

Original sector

Green Energy

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Solar, Manufacturing (Industrial), Energy Storage, Raw Materials, Automotive, Power Generation (CCGT), Electric Vehicles (EVs), Commercial, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project