logo

Summerside Water Pollution Control Biosolids Phase 2

Sector: Hydrogen • Location: Summerside, Prince Edward Island, Canada

Source: Dodge USA

Project
Closed

The project is located in Summerside, PEI, at the Water Pollution Control Centre Site. The work generally includes removal of an existing rotary press, installation of a new owner supplied centrifuge, new conveyor pump upgrades, piping modifications, ammonia scrubber pipe modifications, ventilation upgrades, ventilation modifications, electrical upgrades, electrical modifications, instrumentation

Status
Closed
Sector
Hydrogen, Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
Location
Summerside, Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Summerside Water Pollution Control Biosolids Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Summerside Water Pollution Control Biosolids Phase 2” is an infrastructure initiative in the Hydrogen sector, located in Summerside, Prince Edward Island, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is located in Summerside, PEI, at the Water Pollution Control Centre Site. The work generally includes removal of an existing rotary press, installation of a new owner supplied centrifuge, new conveyor pump upgrades, piping modifications, ammonia scrubber pipe modifications, ventilation upgrades, ventilation modifications, electrical upgrades, electrical modifications, instrumentation upgrades

Procurement method

Budget

Location

Country

Canada

State

Prince Edward Island

City

Summerside

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydrogen, Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project