Summerside Water Replacements
Sector: Water Supply and Storage • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
This project consists of replacing aging, leaking and deteriorating water mains, valves, hydrants and services throughout the city. The scope of the project is to install new water main complete with all the services, hydrants valves and fittings while customers are still on the old lines. Once the new lines are installed and passed quality testing the customers will be connected to the new line w
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of replacing aging, leaking and deteriorating water mains, valves, hydrants and services throughout the city. The scope of the project is to install new water main complete with all the services, hydrants valves and fittings while customers are still on the old lines. Once the new lines are installed and passed quality testing the customers will be connected to the new line with minimal disturbance. It includes 3 kilometers of 10, 8, 6 and 4-inch diameter water main. Part of that would be 1.5kilometers of ¾ inch water service pipe, approximately 15 fire hydrants and 15 main line valves plus other fittings required to meet all regulations. The aim is to have the old deteriorated and break prone water infrastructure replaced to avoid costly and long shutdowns to the end users being the businesses and residents of the city. By replacing these old and underperforming lines water quality in the city will improve and the amount of water the city takes from groundwater table will lessen as a result. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
