Summersville Dam Butterfly Valve Prep and Paint
Sector: Water Supply and Storage • Location: Summersville, West Virginia, United States of America
Source: Dodge USA
This contract consists of cleaning two 9 and one 36 butterfly valves at Summersville outlet structure. Cleaned valves shall have no scaling paint, no grease, and be dry prior to paint application. Once cleaned, valves shall be painted with two coats of marine grade epoxy.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Hydro, Waste Processing and Treatment
- Location
- Summersville, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Summersville Dam Butterfly Valve Prep and Paint
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract consists of cleaning two 9 and one 36 butterfly valves at Summersville outlet structure. Cleaned valves shall have no scaling paint, no grease, and be dry prior to paint application. Once cleaned, valves shall be painted with two coats of marine grade epoxy. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Summersville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Hydro, Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
