Summit Area Sanitary Sewer Extension
Sector: Raw Materials • Location: Reynoldsburg, Ohio, United States of America
Source: Dodge USA
The scope of this project includes installing 5,426 lf of 18 sanitary sewer north along Taylor Road SW and then onto 8899 Taylor Road SW property. The project requires 75 lf of jack and bore installation to construct the sanitary sewer underneath an existing box culvert located in Taylor Road SW
- Status
- Closed
- Sector
- Raw Materials, Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial
- Location
- Reynoldsburg, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Summit Area Sanitary Sewer Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of this project includes installing 5,426 lf of 18 sanitary sewer north along Taylor Road SW and then onto 8899 Taylor Road SW property. The project requires 75 lf of jack and bore installation to construct the sanitary sewer underneath an existing box culvert located in Taylor Road SW |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Reynoldsburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
