logo
ProjectClosed

Summit Ave Watermain Replacement

Closed · North Dakota · Last reported Apr 2024

Source: Dodge USA

The Project includes the following Work: Abandoning existing asbestos cement watermain in place and installing approximately 775 linear feet new 6-inch PVC watermain adjacent to the existing watermain. The project will include new fire hydrants, valves, removal of asphalt pavement and replacement with a temporary surface, and landscaping and restoration. Separate Bids will be received for Contract

Status
Closed
Sector
Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
Location
Hebron, North Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Summit Ave Watermain Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Summit Ave Watermain Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Hebron, North Dakota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the following Work: Abandoning existing asbestos cement watermain in place and installing approximately 775 linear feet new 6-inch PVC watermain adjacent to the existing watermain. The project will include new fire hydrants, valves, removal of asphalt pavement and replacement with a temporary surface, and landscaping and restoration. Separate Bids will be received for Contract No.1 General Construction on a unit price basis as indicated in the Bid Form.

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Hebron

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project