Summit Boulevard Rehabilitation
Sector: Water Supply and Storage • Location: Big Bear Lake, California, United States of America
Source: Dodge USA
This project generally includes reconstruction of Summit Blvd., from Big Bear Blvd. to Switzerland Dr., including activities such as pulverization and disposal of existing pavement, grading, asphalt concrete (AC) paving, reconstruction of curb and gutter, storm drain improvements, and other appurtenant work.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
- Location
- Big Bear Lake, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Summit Boulevard Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project generally includes reconstruction of Summit Blvd., from Big Bear Blvd. to Switzerland Dr., including activities such as pulverization and disposal of existing pavement, grading, asphalt concrete (AC) paving, reconstruction of curb and gutter, storm drain improvements, and other appurtenant work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Big Bear Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
