Summit Carbon Pipeline Project
Awarded · North Dakota · Last reported Nov 2024
Source: Carbon Herald
The Summit Carbon Pipeline Project involves the construction of a 333-mile pipeline in North Dakota, part of a larger 2,500-mile network designed to transport carbon dioxide from 57 ethanol plants to a storage site. This project aims to capture carbon emissions from ethanol production and store them underground, contributing to the reduction of greenhouse gases.
- Status
- Closed
- Sector
- Residential, Commercial
- Location
- North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Carbon Herald
ConstructChat
Ask ConstructChat about Summit Carbon Pipeline Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Summit Carbon Pipeline Project involves the construction of a 333-mile pipeline in North Dakota, part of a larger 2,500-mile network designed to transport carbon dioxide from 57 ethanol plants to a storage site. This project aims to capture carbon emissions from ethanol production and store them underground, contributing to the reduction of greenhouse gases. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | North Dakota |
Source
Source | Carbon Herald |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
