Summit Flex Space
Sector: Metal • Location: Austin, Texas, United States of America
Source: Dodge USA
New 14,751 SF metal building flex space with 3 potential partitions. New foundation, new metal building shell with doors and windows. No interior office framing. New asphalt parking area.
- Status
- Prospective
- Sector
- Metal, Commercial, Car parking, Manufacturing (Industrial), Road, Warehouse, Residential, Automotive
- Location
- Austin, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Summit Flex Space
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | New 14,751 SF metal building flex space with 3 potential partitions. New foundation, new metal building shell with doors and windows. No interior office framing. New asphalt parking area. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Car parking, Manufacturing (Industrial), Road, Warehouse, Residential, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
