Summit Lake Overhead No. 01522 Repairs
Sector: Bridge • Location: Kamloops, British Columbia, Canada
Source: Dodge USA
Summit Lake Overhead requires repair work to be performed to ensure it can continue to carry highway legal loads until a major rehabilitation or replacement can be done in approximately five years. The repairs to the bridge include: Ultra-High Performance Concrete repairs to 35 stringer ends, Replacement of 13 deck joints, Concrete deck patch repairs and pier concrete patch repairs.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bid results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Summit Lake Overhead requires repair work to be performed to ensure it can continue to carry highway legal loads until a major rehabilitation or replacement can be done in approximately five years. The repairs to the bridge include: Ultra-High Performance Concrete repairs to 35 stringer ends, Replacement of 13 deck joints, Concrete deck patch repairs and pier concrete patch repairs. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
