Summit Pressure Zone South Pipeline Replacement Phase 2A
Sector: Water Supply and Storage • Location: Oakland, California, United States of America
Source: Dodge
Work includes: Furnish and install approximately 1,935 horizontal linear feet LF of 24-inch, 30 LF of 16-inch and 55 LF of 12-inch mortar lined and coated steel ML&CS pipe, all connection piping, appurtenances, and fittings. Remove three trees within Caltrans right-of-way as approved by the Engineer. Provide required traffic control measures. Remove and dispose of abandoned pipelines for installat
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment, Road, Metal
- Location
- Oakland, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Summit Pressure Zone South Pipeline Replacement Phase 2A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes: Furnish and install approximately 1,935 horizontal linear feet LF of 24-inch, 30 LF of 16-inch and 55 LF of 12-inch mortar lined and coated steel ML&CS pipe, all connection piping, appurtenances, and fittings. Remove three trees within Caltrans right-of-way as approved by the Engineer. Provide required traffic control measures. Remove and dispose of abandoned pipelines for installation of new pipelines. Provide final restoration of pavement and restore Firestorm Memorial Garden... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Oakland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment, Road, Metal |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
