logo

Sun Edison Rooftop Solar Project_2.5MW

Sector: Commercial • Location: India

Source: World Bank Group

Project
Active

In April 2012, Gujarat Government's Department of Energy and Petrochemicals signed a 25-year concession agreement (from the scheduled commercial operation date) with Sun Edison Private Limited, to construct and operate a 2.5 MW rooftop solar power (“Project”) in Gandhinagar. The Gujarat Government shall provide Sun Edison access to around 25 state government owned building rooftops which should be

Project Information FAQ

Project Information

5 Q
The project “Sun Edison Rooftop Solar Project 2.5MW” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In April 2012, Gujarat Government's Department of Energy and Petrochemicals signed a 25-year concession agreement (from the scheduled commercial operation date) with Sun Edison Private Limited, to construct and operate a 2.5 MW rooftop solar power (“Project”) in Gandhinagar. The Gujarat Government shall provide Sun Edison access to around 25 state government owned building rooftops which should be sufficient to generate about 2 MW, while the balance 0.5 MW would be generated by installing rooftop systems on around 250 households. As per a government notification the city residents shall be encouraged to come forward to participate and shall be offered “green incentive” – which is set as INR 3/ kWh of electricity generated by the SPV system installed on their property. Sun Edison would then connect power generated by the panels to the city grid While about 40 companies had expressed interest in the project, finally only four companies submitted their bids. This included Lanco Infratech, SunEdison, Azure Power and Mahindra Solar. The winning bidders were those quoting the lowest tariff. Out of these SunEdison and Azure Power were selected and have been awarded for individual phases of 2.5 MW each. The International Finance Corporation (IFC) was the Lead Transaction Advisor for designing and implementing the transaction. The power generated under the Project will be sold at the bidded tariff to Torrent Power Limited (“TPL”), a privately owned distribution company that holds the license for electricity distribution in Gandhinagar and several other cities in Gujarat. Sun Edison won the bid at a quoted tariff of (through a 25-year Power Purchase Agreement) US$ 0.220/Unit (INR 11.793 per unit @53.44 INR/USD). Financial closure was achieved on 6th February 2013. The project was estimated to cost US$ 5 million at the time of financial closure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data