Sun Metro Electric Paratransit Vehicle Charging Stations
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Work consists of the following: 1. Installation of electrical distribution equipment and infrastructure to provide power to electric vehicle charging stations. This will include metering means, distribution switchgear, wire, trenching, backfill and modifications to the parking area as indicated in Contract Documents. 2. Installation of underground conduits to provide ethernet connectivity to each
- Status
- Under Construction
- Sector
- Automotive, Mass Transit, Car parking, Power Generation (CCGT), Electric Vehicles (EVs), Government, Commercial, Manufacturing (Industrial)
- Location
- El Paso, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sun Metro Electric Paratransit Vehicle Charging Stations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work consists of the following: 1. Installation of electrical distribution equipment and infrastructure to provide power to electric vehicle charging stations. This will include metering means, distribution switchgear, wire, trenching, backfill and modifications to the parking area as indicated in Contract Documents. 2. Installation of underground conduits to provide ethernet connectivity to each charging station and the installation of outdoor rated IT enclosure for ethernet terminaions. Thi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | El Paso |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Mass Transit, Car parking, Power Generation (CCGT), Electric Vehicles (EVs), Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
