logo

Sun Pacific Solar Expansion Project

Sector: Airport • Location: Samoa

Source: Asian Development Bank (ADB)

Project

The Project involves a loan of up to $2.8 million (in Australian dollar eqivalent) to Sun Pacific Energy Limited (SPEL), a private company incorporated in Samoa, for upgrading and expanding SPEL's existing solar power plant, the Upolu Solar Farm (Solar Farm). The Solar Farm is located at the Faleolo International Airport and was Samoa's first independent solar power producer project. The energy fr

Project Information FAQ

Project Information

4 Q
The project “Sun Pacific Solar Expansion Project” is an infrastructure initiative in the Airport sector, located in Samoa. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project involves a loan of up to $2.8 million (in Australian dollar eqivalent) to Sun Pacific Energy Limited (SPEL), a private company incorporated in Samoa, for upgrading and expanding SPEL's existing solar power plant, the Upolu Solar Farm (Solar Farm). The Solar Farm is located at the Faleolo International Airport and was Samoa's first independent solar power producer project. The energy from the Solar Farm is sold to Samoa's state-owned utility (EPC). The Solar Farm will be upgraded from 4.2MW (AC) to a total installed capacity of 6.0MW(AC) by replacing all older, less efficient ReneSola 305Wp panels (installed in 2014) and a portion of the YingLi 350Wp panels (installed in 2018 with ADB financing) with newer, high efficiency 625Mp JA Solar bifacial panels. This upgrade is expected to increase the Solar Farm's generation capacity from the current estimated 6.2 GWh/year to approximately 9.6 GWh/year, supporting Samoa's renewable energy targets.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data