logo

Sunborne Energy Rajasthan Solar Private Limited

Sector: Geothermal • Location: India

Source: World Bank Group

Project
Active

In December 2011, Sunborne Energy Rajasthan Solar Private Limited (SERSPL), a project SPV of SunBorne Energy Services India Private Limited, was awarded the license for setting up a 5MW grid connected solar Photo voltaic power project located at Gadna village, in Jodhpur District of Rajasthan under the Jawaharlal Nehru Solar Mission (JNNSM) Phase-I Batch-II of the scheme. Under the JNNSM the total

Project Information FAQ

Project Information

5 Q
The project “Sunborne Energy Rajasthan Solar Private Limited” is an infrastructure initiative in the Geothermal sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2011, Sunborne Energy Rajasthan Solar Private Limited (SERSPL), a project SPV of SunBorne Energy Services India Private Limited, was awarded the license for setting up a 5MW grid connected solar Photo voltaic power project located at Gadna village, in Jodhpur District of Rajasthan under the Jawaharlal Nehru Solar Mission (JNNSM) Phase-I Batch-II of the scheme. Under the JNNSM the total aggregated capacity of grid connected Solar PV Projects in Phase-1 was expected to be 500 MW. 150MW aggregate had already been allotted in FY2010-11 as a part of Batch-I of JNNSM Phase-I, and allotment for the remaining 350 MW Solar PV Projects was carried out through Batch-II bidding. SERSPL had acquired land for the project. The output from the project would be fed to the Northern,Eastern,Western and North Eastern (NEWNE) grid of India. The plant would use high power modules using cells consisting of Cadmium Telluride (CdTe) based thin film technology. SunBorne Energy Services India Private Limited (SESIPL- a group company) was contracted in January 2012 to execute the EPC work. The JNNSM mission had designated NTPC’s Vidyut Vyapar Nigam Limited (NVVN) as the nodal agency for procurement of solar power. In October 2011, NVVN invited RFQs from interested developers to develop 350 MW solar PV projects with a capacity of 5 MW each, with a minimum capacity of 5 MW and maximum of 50 MW each. NVVN received 210 RFQ responses on 17th November 2011 from PV solar project developers. As the total capacity of the shortlisted projects were in excess of the approved capacity of 350 MW Solar PV Projects, bidders were required to submit proposals offering maximum discount on the CERC (Central Regulator) approved applicable tariff for grid connected solar power projects for FY 2011-12 - a reverse bidding auction process. The last date for the submission of proposal was December 2011. NVVN received 180 bids from project developers indicating discounts offered by each over CERC determined tariff of US$ 0.329/kWh (INR 15.39/kWh @46.67 INR/USD). The winning bids for solar PV under Batch-II of JNNSM Phase-I varied from INR 7.49/kWh to INR 9.41/kWh, at an average bid price of INR 12.15/kWh. Since the target allocation for solar thermal projects was 350 MW, only the top 20 discounts were finally selected to set up solar power projects. Sunborne Rajasthan had won the project by quoting a tariff of US$ 0.193/KwH (INR 8.99/kWh - a discount of 640 paise). On 27th January 2012, Sunborne Rajasthan had entered into a 25-year Power Purchase Agreement with NTPC Vidyut Vyapar Nigam (NVVN), which was the the nodal agency to purchase solar power generated by independent solar power producers,under JNNSM. JNNSM provided for a scheme of "bundling" relatively expensive solar power with cheaper power from the unallocated quota of the Government of India out of the capacity of the NTPC based coal stations.This cheaper bundled power would then be sold to state power distribution companies at the CERC regulated price. This would bring down the gap between the average cost of power and sales price of power of the state Discom. The total capacity of 5MW was also eligible for carbon credits. Sunborne would pass on the gross benefits of CDM to the distribution licensee (NVVN) in the following manner - (a) 100% of the gross proceeds to be retained by Sunborne in the 1st year after the date of COD, (b) in the 2nd year, the share of NVVN would be 10% which would be progressively increased by 10% every year till it reaches 50%, where after the proceeds would be shared equally by Sunborne and NVVN. Transmission and/or wheeling charges would be paid by Sunborne Rajasthan. Financial closure took place in November 2012.The total project cost estimated at the time of financial closure was US$ 9.92mn (INR 530mn @53.44 INR/USD).The debt equity ratio for the project was 70/30. Financing comprised of a 13-year US Dollar term loan of US$ 4.67mn (INR 249.6mn), a 13-year domestic currency

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data