Sunbury Cheshire Road Lift Station Upgrades
Sector: Road • Location: Sunbury, Ohio, United States of America
Source: Dodge
The Project Consists Of The Removal And Replacement Of The Dual Submersible Pumps At The Existing Cheshire Road Lift Station (Ls) And Control Panel. The Existing Lift Station Is Located Approximately 1,300-ft East Of The Intersection Of Cheshire Road And Domigan Road, On The North Side Of Cheshire Road.
- Status
- Closed
- Sector
- Road, Government, Waste Processing and Treatment, Commercial
- Location
- Sunbury, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sunbury Cheshire Road Lift Station Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project Consists Of The Removal And Replacement Of The Dual Submersible Pumps At The Existing Cheshire Road Lift Station (Ls) And Control Panel. The Existing Lift Station Is Located Approximately 1,300-ft East Of The Intersection Of Cheshire Road And Domigan Road, On The North Side Of Cheshire Road. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Sunbury |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
