Suncoast Parkway 2 Phase 3
Sector: Residential • Location: Tallahassee, Florida, USA
Source: Florida Turnpike
The Suncoast Parkway 2 Phase 3 will be a fourlane two lanes in each direction toll facility that extends from CR 486 to US 19 a distance of approximately ten miles. The project will include the followingThe proposed roadway is following the approved alignment that was developed during the Project Development and Environment PDE Study completed in 1998. The PDE Study considered several alignment al
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | prospective |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Suncoast Parkway 2 Phase 3 will be a fourlane two lanes in each direction toll facility that extends from CR 486 to US 19 a distance of approximately ten miles. The project will include the followingThe proposed roadway is following the approved alignment that was developed during the Project Development and Environment PDE Study completed in 1998. The PDE Study considered several alignment alternatives for the proposed extension of the Suncoast Parkway 2 State Road SR 589. The chosen alignment was selected based on providing the most efficient corridor to minimize impacts to residential areas and environmentally protected lands and species.The 1998 State Environmental Impact Report SEIR which was developed during this process was reevaluated in 2010 2017 and 2022 for other design phases. The Enterprise plans to perform another reevaluation for the Phase3 design segments after the Spring 2023 Public Information Meeting. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
