Sundial WWTP Expansion
Sector: Water Supply and Storage • Location: Milton, Florida, United States
Source: ArcGIS StoryMaps
This 5.95-acre lot zoned HCD (Highway Commercial Development) is a Public/Private Utility Facility project to expand the existing wastewater treatment facility. Upgrades include replacing the screen and adding a grit removal system with an additional aeration basin for aero-mod train 1, aero-mod train 2, an additional Chlorine Contact Chamber (CCC) and removal of the existing chemical feed buildin
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Power Transmission, Power Generation (CCGT), Chemical (Industrial), Rail, Car parking, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Automotive
- Location
- Milton, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- ArcGIS StoryMaps
ConstructChat
Ask ConstructChat about Sundial WWTP Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This 5.95-acre lot zoned HCD (Highway Commercial Development) is a Public/Private Utility Facility project to expand the existing wastewater treatment facility. Upgrades include replacing the screen and adding a grit removal system with an additional aeration basin for aero-mod train 1, aero-mod train 2, an additional Chlorine Contact Chamber (CCC) and removal of the existing chemical feed building with a new feed building. This includes new piping to the existing rapid infiltration basins (RIBs). Surrounding the new chemical feed building, there will be a gravel road to its entrance and a gravity wall on the south side of aeration basin aero-mod train 1. The new building’s size totals 450.24 sq. ft. and will have 5 parking spaces. The property has two rezonings, case numbers 1996-R-018 & 2013-R-008 which rezoned the property from AG and R2 to its current HCD zoning. |
Original sector | Built Environment |
Location
Country | United States of America (USA) |
State | Florida |
City | Milton |
Source
Source | ArcGIS StoryMaps |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Power Transmission, Power Generation (CCGT), Chemical (Industrial), Rail, Car parking, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Automotive |
Article published date | 2026-04-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
