logo

Sundial WWTP Expansion

Sector: Water Supply and Storage • Location: Milton, Florida, United States

Source: ArcGIS StoryMaps

Project
Approved

This 5.95-acre lot zoned HCD (Highway Commercial Development) is a Public/Private Utility Facility project to expand the existing wastewater treatment facility. Upgrades include replacing the screen and adding a grit removal system with an additional aeration basin for aero-mod train 1, aero-mod train 2, an additional Chlorine Contact Chamber (CCC) and removal of the existing chemical feed buildin

Status
Prospective
Sector
Water Supply and Storage, Road, Power Transmission, Power Generation (CCGT), Chemical (Industrial), Rail, Car parking, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Automotive
Location
Milton, Florida, United States of America
Updated
22 Jul 2026
Source
ArcGIS StoryMaps

ConstructChat

Ask ConstructChat about Sundial WWTP Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Sundial WWTP Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in Milton, Florida, United States. Taiyo aggregates data on it from ArcGIS StoryMaps.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This 5.95-acre lot zoned HCD (Highway Commercial Development) is a Public/Private Utility Facility project to expand the existing wastewater treatment facility. Upgrades include replacing the screen and adding a grit removal system with an additional aeration basin for aero-mod train 1, aero-mod train 2, an additional Chlorine Contact Chamber (CCC) and removal of the existing chemical feed building with a new feed building. This includes new piping to the existing rapid infiltration basins (RIBs). Surrounding the new chemical feed building, there will be a gravel road to its entrance and a gravity wall on the south side of aeration basin aero-mod train 1. The new building’s size totals 450.24 sq. ft. and will have 5 parking spaces. The property has two rezonings, case numbers 1996-R-018 & 2013-R-008 which rezoned the property from AG and R2 to its current HCD zoning.

Original sector

Built Environment

Location

Country

United States of America (USA)

State

Florida

City

Milton

Source

Source

ArcGIS StoryMaps

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Power Transmission, Power Generation (CCGT), Chemical (Industrial), Rail, Car parking, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Automotive

Article published date

2026-04-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project