SunEdison CAP

Sector: Solar • Location: Chile

Source: International Finance Corporation (IFC)

Project
Completed

The proposed project involves the installation of an approximately 100MW solar photovoltaic plant on a site of approximately 306 hectares within the Atacama Desert in the Copiapo municipality in Chile’s Atacama Region, at an altitude of 1,165 meters above sea level. Access to the project is granted through State road C-309, a further path will be implemented to access the exact plant terrain. The

Project Information FAQ

Project Information

4 Q
The project “SunEdison CAP” is an infrastructure initiative in the Solar sector, located in Chile. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project involves the installation of an approximately 100MW solar photovoltaic plant on a site of approximately 306 hectares within the Atacama Desert in the Copiapo municipality in Chile’s Atacama Region, at an altitude of 1,165 meters above sea level. Access to the project is granted through State road C-309, a further path will be implemented to access the exact plant terrain. The nearest population settlement, Copiapo, is approximately 28 km from the project site.The project will be developed by SunEdison Chile Construction Limitada (the “Contractor”) which is a wholly own subsidiary of a world class solar integrator and existing IFC client, Sun Edison LLC (“SunEdison”). The ground mounted photovoltaic crystalline modules will be provided by SunEdison parent company, MEMC. The photovoltaic modules to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an Inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the Sistema Interconectado Central (SIC). The project is expected to have an annual generation capacity of up to 270 GWh based on an estimated energy yield (post availability of 99%) of approximately 2,700 kWh/kWp. SunEdison will build the project through an EPC contract with the Company. As part of the project, the Company will install an approximately 9 kilometers transmission line (220 kV) to transport the generated electricity to the 220 kV Cardones – Cerro Negro Norte main grid transmission line, heading South. The anticipated length is of 370 m and the expected width will be 23 m on each side of the line. The right-of-way (r-o-w) of the transmission line is located to the southwest of the Project site on government land. The company is currently processing the r-o-w use with the Ministry of Bienes Nacionales which is in charge of public lands in Chile.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data