The proposed project involves the installation of an approximately 100MW solar photovoltaic plant on a site of approximately 306 hectares within the Atacama Desert in the Copiapo municipality in Chile’s Atacama Region, at an altitude of 1,165 meters above sea level. Access to the project is granted through State road C-309, a further path will be implemented to access the exact plant terrain. The
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Road, Government
- Location
- Chile
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about SunEdison CAP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project involves the installation of an approximately 100MW solar photovoltaic plant on a site of approximately 306 hectares within the Atacama Desert in the Copiapo municipality in Chile’s Atacama Region, at an altitude of 1,165 meters above sea level. Access to the project is granted through State road C-309, a further path will be implemented to access the exact plant terrain. The nearest population settlement, Copiapo, is approximately 28 km from the project site.The project will be developed by SunEdison Chile Construction Limitada (the “Contractor”) which is a wholly own subsidiary of a world class solar integrator and existing IFC client, Sun Edison LLC (“SunEdison”). The ground mounted photovoltaic crystalline modules will be provided by SunEdison parent company, MEMC. The photovoltaic modules to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an Inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the Sistema Interconectado Central (SIC). The project is expected to have an annual generation capacity of up to 270 GWh based on an estimated energy yield (post availability of 99%) of approximately 2,700 kWh/kWp. SunEdison will build the project through an EPC contract with the Company. As part of the project, the Company will install an approximately 9 kilometers transmission line (220 kV) to transport the generated electricity to the 220 kV Cardones – Cerro Negro Norte main grid transmission line, heading South. The anticipated length is of 370 m and the expected width will be 23 m on each side of the line. The right-of-way (r-o-w) of the transmission line is located to the southwest of the Project site on government land. The company is currently processing the r-o-w use with the Ministry of Bienes Nacionales which is in charge of public lands in Chile. |
Original sector | V-BF - Solar - Renewable Energy Generation |
Location
Country | Chile |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Road, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project