logo

Suneng Zhengming 400MW wind and solar energy new energy project

Sector: Solar • Location: China

Source: World Bank Group

Project
Active

The project comprises the development of Suneng Zhengming 400MW wind and solar energy base. The sponsor is Suneng Group. It started construction around June 17, 2024. The base is located at Yihe Nur Sumu, Zhengxiang Baiqi, Xilin Gol League, Inner Mongolia Autonomous Region. The total investment of the project is about $264.8m or 1.922 billion yuan. The construction scale of the wind power project

Project Information FAQ

Project Information

4 Q
The project “Suneng Zhengming 400MW wind and solar energy new energy project” is an infrastructure initiative in the Solar sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the development of Suneng Zhengming 400MW wind and solar energy base. The sponsor is Suneng Group. It started construction around June 17, 2024. The base is located at Yihe Nur Sumu, Zhengxiang Baiqi, Xilin Gol League, Inner Mongolia Autonomous Region. The total investment of the project is about $264.8m or 1.922 billion yuan. The construction scale of the wind power project is 320MW. It is planned to install 33 wind turbines with a single capacity of 6.7MW and 10 wind turbines with a single capacity of 10MW. The rated installed capacity of the photovoltaic project is 80MW, and the total installed capacity on the DC side is 97.5MWp. A 220kV booster station, a 60MW/120MWh energy storage power station, and two 50Mvar phase shifters will be built. As an integrated 'wind, solar and storage' project, after its completion, the project will transmit about 950 million kWh of green electricity annually through ultra-high voltage power channels, saving about 350,000 tons of standard coal and reducing carbon dioxide emissions by about 860,000 tons each year. https://wind.imarine.cn/news/94261.html https://wind.imarine.cn/news/94261.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data