Sungai Limau Water Treatment Plant (WTP) Project
Sector: Water Supply and Storage • Location: Baling, Kedah, Malaysia
Source: Bernama
The Sungai Limau Water Treatment Plant project in Baling has faced significant delays, with no progress reported since July 2024. The project, which began in 2021, involves the construction of 15 components, none of which have been completed. The Ministry of Energy Transition and Water Transformation is considering terminating the current contractors due to these delays.
- Status
- Under Construction
- Sector
- Water Supply and Storage
- Location
- Baling, Kedah, Malaysia
- Updated
- 22 Jul 2026
- Source
- Bernama
ConstructChat
Ask ConstructChat about Sungai Limau Water Treatment Plant (WTP) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sungai Limau Water Treatment Plant project in Baling has faced significant delays, with no progress reported since July 2024. The project, which began in 2021, involves the construction of 15 components, none of which have been completed. The Ministry of Energy Transition and Water Transformation is considering terminating the current contractors due to these delays. |
Original sector | Water Supply |
Location
Country | Malaysia |
State | Kedah |
City | Baling |
Source
Source | Bernama |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
