Sunglass Hut #4733 @ Wrentham Village Premium Outlets
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Ceiling- existing act ceiling painted in p-57. New act ceiling in expansion of retail area painted in p-57. Replace any damaged tilesboh- existing rtu is undersized - add a supplemental unit and reuse existing hvac- non-ada employee only restroom, since the public ada restrooms are within the distance required (185').Technology- new tech rack needed- existing electrical panel can be kept + full el
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential
- Location
- Wrentham, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sunglass Hut #4733 @ Wrentham Village Premium Outlets
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ceiling- existing act ceiling painted in p-57. New act ceiling in expansion of retail area painted in p-57. Replace any damaged tilesboh- existing rtu is undersized - add a supplemental unit and reuse existing hvac- non-ada employee only restroom, since the public ada restrooms are within the distance required (185').Technology- new tech rack needed- existing electrical panel can be kept + full electrical redistributionother- security glass for fashion and luxury product (17%) per kick off- r... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Wrentham |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
