Sunon-Asogli Gas Fired Power Plant

Sector: Power Generation (CCGT) • Location: Ashanti, Ghana

Source: World Bank Group

Project
Active

The Suson-Asogli Power plant project is a private sector gas-steam combine cycle power plant project. It came to fruition as an Ghanaian businessman and paramount chief of Asogli state, Togbe Afede XIV, visited China and succeeded in bringing on board Shenzen Energy Group Limited and the China-African Development Fund (CADFUND). They founded the Chinese power producer Suson-Asogli Power (Ghana) Li

Project Information FAQ

Project Information

5 Q
The project “Sunon-Asogli Gas Fired Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ashanti, Ghana. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Suson-Asogli Power plant project is a private sector gas-steam combine cycle power plant project. It came to fruition as an Ghanaian businessman and paramount chief of Asogli state, Togbe Afede XIV, visited China and succeeded in bringing on board Shenzen Energy Group Limited and the China-African Development Fund (CADFUND). They founded the Chinese power producer Suson-Asogli Power (Ghana) Limited, which is jointly owned by Shenzen Energy Corporation and CADFUND, whereby the former has 60%, the latter 40% of the shares. The project consists of a first phase (200MW), for which financial closure was reached in 2007; a second phase (another 360MW), being implemented in 2011 although the sponsor did only commit the money; and a last phase, expected in 2012, for another 440MW that was to bring the total capacity of the plant up to 1000MW. The first phase cost $200 million, the second phase $360 million, and the financing for the third and last round was still being negotiated in early 2012. The construction of the first phase was comleted in 2009. The funding of the first phase was provided by the sponsors. The production of the electricity was directly fed into the Ghana Grid Company Limited (GRIDCo) network, as well as Electricity Company of Ghana (ECG). The gas supplied to the plant was part of the Volta River Authority's consignment for which Asogli had signed a contractual agreement with the West African Gas Pipeline Company (WAPCO). The plant wanted to receive direct supplies from the WAPCO pipeline, but this was still being negotiated. * Phase III (560MW > 1000MW) expected in 2012. * Sponsor update needed ("Others": Shenzhen Energy and CADfund)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data