logo

Sunpin 4.3 MW Ground-Mounted Solar Array with Battery Storage

Sector: Solar • Location: Petersham, Massachusetts, United States

Source: The National Law Review

Project
Under Appeal

Sunpin Energy Services and landowner Ralph Lapinkas proposed to build a 4.3 MW ground-mounted solar array with battery storage on a roughly 24-acre wooded parcel in Petersham, Massachusetts. The project required clearing about 14 acres of trees. The town of Petersham allows large-scale solar systems as-of-right only within a small town-owned overlay district; all other projects require a special p

Status
Prospective
Sector
Solar, Energy Storage
Location
Petersham, Massachusetts, United States of America
Updated
22 Jul 2026
Source
The National Law Review

ConstructChat

Ask ConstructChat about Sunpin 4.3 MW Ground-Mounted Solar Array with Battery Storage

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Sunpin 4.3 MW Ground-Mounted Solar Array with Battery Storage” is an infrastructure initiative in the Solar sector, located in Petersham, Massachusetts, United States. Taiyo aggregates data on it from The National Law Review.

Participants

Not available for this record.

Status

Original status

under appeal

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sunpin Energy Services and landowner Ralph Lapinkas proposed to build a 4.3 MW ground-mounted solar array with battery storage on a roughly 24-acre wooded parcel in Petersham, Massachusetts. The project required clearing about 14 acres of trees. The town of Petersham allows large-scale solar systems as-of-right only within a small town-owned overlay district; all other projects require a special permit. The project faced denial due to a dissenting vote in the zoning board, leading to legal appeals and a Massachusetts Supreme Judicial Court decision clarifying the statutory protections for solar energy systems and the conditions under which municipalities can deny such projects.

Original sector

Energy

Location

Country

United States of America (USA)

State

Massachusetts

City

Petersham

Source

Source

The National Law Review

URL

More Details

Record type

Project

Sector

Solar, Energy Storage

Article published date

2026-07-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project