logo

Sunrise Diamond Solar Farm

Sector: Road • Location: Grove City, Pennsylvania, United States of America

Source: Dodge USA

Project
Pre-Design

construct a utility-size solar farm -- defined as a facility with a generation capacity of 1 megawatt or more -- at 247 Diamond Road,

Status
Prospective
Sector
Road, Commercial, Power Transmission, Raw Materials, Power Generation (CCGT), Solar
Location
Grove City, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Sunrise Diamond Solar Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sunrise Diamond Solar Farm” is an infrastructure initiative in the Road sector, located in Grove City, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

construct a utility-size solar farm -- defined as a facility with a generation capacity of 1 megawatt or more -- at 247 Diamond Road,

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Grove City

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Commercial, Power Transmission, Raw Materials, Power Generation (CCGT), Solar

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project